library · Scheduling & coordination
Scheduling & coordination
Holding the week: who is where, when, and what they need.
Why this category exists, and at this size: F5.4 — scheduling +194%, the single largest measured gap. The finding IDs are in the evidence base.
Groups
Something missing, or something weighted wrong?
This is the part of Champignon that is genuinely unfinished, and the part a person outside this household can fix. Two routes, neither of which needs an account:
- Something we don't have — a task you do that isn't listed here.
- A weight that looks wrong — tell us which row, and what it should sit above or below. A comparison is actionable; feels wrong on its own isn't.
What happens next, and how a weight actually changes, is on Contribute.